VUNG ANG 1-2×600 MW Coal Fired Power Plant Project

Scope of Work: Engineering, Design, Supply, Construction, Testing, Commissioning and full-time service during 2 years warranty period of:

EPC Contractor for Main Cooling Water System

  • Year start: 2009
  • Year completion: 2014
  • Project Owner: PVN
  • Main EPC Contractor: Lilama Corporation
  • Five (5) x 13.2m3/s Main Cooling Water Pumps and Motors;
  • Two (2) x 600m3/hr Filling Water Pumps;
  • Two (2) x DN 3500mm Cooling Water Pipes each 1018m long;
  • Five (5) Channels Intake Screening Equipment;
  • Three (3) sets Gas Chlorination Equipment 125kg/hr each;
  • Discharge Valves, Vacuum Breaker Valves and accessories;
  • LV Switchgear, and electrical power supply system for CW system
  • Instruments and control system for CW system