Uong Bi Extension Project 300MW Coal Fired Power Plant

EPC Contractor for Main Cooling Water System

  • Year start: 2003
  • Year completion: 2005
  • Project Owner: EVN
  • Main EPC Contractor: Lilama Corporation

Scope of Work: Engineering, Design, Supply, Construction, Testing, Commissioning and full-time service during 2 years warranty period of:

  • Two (2) x 6.0m3/s Main Cooling Water Pumps and Motors;
  • Two (2) x 3.0m3/s Main Cooling Water Pumps for Existing PP;
  • Two (2) x 500m3/hr Filling Water Pumps;
  • Two (2) x DN 2500mm Cooling Water Pipes each 5210m long;
  • Five (5) Channels Intake Screening Equipment;
  • Two (2) sets Gas Chlorination Equipment 80kg/hr each;
  • Discharge Valves, Vacuum Breaker Valves and accessories;
  • LV Switchgear, and electrical power supply system for CW system
  • Instruments and control system for CW system

 