NHON TRACH 2 CCPP Project 750 MW Combined Cycle Power Plant

EPC Contractor for Overall BOP System

  • Year start: 2009
  • Year completion: 2011
  • Project Owner: PVN
  • Main EPC Contractor: Lilama Corporation

Scope of Work: Engineering, Design, Supply, Construction, Testing, Commissioning and full-time service during 2 years warranty period of:

  • Main Cooling Water System;
  • Fuel Gas Supply System;
  • Fuel Oil Storage and Supply System;
  • Water and Wastewater Treatment Plant;
  • Compressed Air System;
  • Nitrogen Supply System;
  • CW Intake Equipment;
  • Gas Chlorination Plant for CW system;
  • Inter-plant Piping System
  • LV Switchgear, and electrical power supply system for CW system
  • Instruments and control system for CW system

 